Brushier

  • GET 2024 day 3, Oct 3, Thursday
  • Start basecamp
  • End basecamp
  • Cleared 10 blowdowns, added cairns, lopped less trail than expected

The hope wns to complete the second quarter of lopping, extending up to basecamp, but a lot of Gambel oak had grown close to the trail and needed to be removed.

Before
After

I toss the cut vegetation as far from the trail as practical, but it is a lot. The area does not have a lot of ground litter in general, but I sure added plenty today.

Author: Jim, Sagebrush

Jim (trail-name Sagebrush) codes audio software for Windows, Linux, Android, and embedded systems. When not working at sagebrush.com, he enjoys backpacking, which this blog is about.

Leave a Reply

Your email address will not be published. Required fields are marked *